Basement. Nov 6 2007
Living Room. Nov 6 2007
Painted kitchen with some cabinets installed. Nov 6 2007
House with completed porch. Nov 6 2007
Front of the house with almost completed porch. Oct 2 2007
One of our loyal volunteers hard at work. Oct 2 2007
4 Volunteers from Grace United, Co-Op Student from St. Mary's and the Build Supervisor, who is also a member of the Construction Committee. Oct 2 2007
SHE Co-ordinator giving safety talk. Sept 25 2007
Basement insulated. Sept 25 2007
Front of the house. Sept 25 2007
Bringing in the drywall. Sept 25 2007
RBC build Sept 20 2007.
RBC build Sept 20 2007.
RBC build Sept 20 2007.
RBC build Sept 20 2007.
RBC build Sept 20 2007.
Working on siding. Aug 24 2007
Insulation. Aug 24 2007
Working on siding. Aug 24 2007
House 3/4 sided. Aug 24 2007
Installing insulation. Aug. 13 2007
Outside of the house from the side. Aug. 13 2007
Outside of the house from the front. Aug. 13 2007
Aug 10 2007
Aug 10 2007
Inside the house Aug. 3 2007.
Inside the house Aug. 3 2007.
Windows all installed. July 19 2007.
Basement as of July 19 2007.
Installing windows. July 6 2007
Working on the outside. July 6 2007
Basement as of June 15 2007
Working on the roof. June 14 2007.
Working on the roof. June 14 2007.
Working on the roof. June 13 2007.
Working on the roof. June 13 2007.
Working on the roof. June 13 2007.
Working on the last wall. June 12 2007
Working on the last wall. June 12 2007
Putting up a wall. June 7 2007.
Kneewall as of June 6 2007.
Floor as of June 6 2007.
Basement as of June 6 2007
St Mary Students working on the basement floor. May 22 2007.
Working on the basement floor. May 22 2007.
St. Mary's students helping out. May 22 2007
St. Mary's students help out. May 22 2007
The build site. April 30 2007
Preparing for exacavating. April 30 2007